Trail Report December 28 2012

The entire system has been compacted , a bit more traffic today. Still water bars not filled in but the water is freezing up.  Drag grooming should begin soon and that should help with the water bar thing. Nice fresh snow early season conditions prevail so use caution as always.

Trail Report December 27, 2012

The storm is as advertised at least 1.5 feet of nice medium heavy stuff. Evan was out along with Stub and Doug using the compactor bar to smooth the powder down. Most gates are open except for the one from the dam parking lot . We rode a few hours and enjoyed it. However it …

Continue reading

“Ingerman Bridge,” a Correction

As it turns out photos of this bridge from Doug in our SmugMug site are not the Blue Ridge Trail Bridge as mentioned in the post View all Blue Ridge Photos but are the Ingerman Bridge in corridor 7 behind the dam. It is quite a bridge. Check it out at SmugMug and hopefully you’ll be crossing it …

Continue reading

Bridge Name Resolved

This is indeed the Blue Ridge Trail Bridge.

Name for Wooden Bridge

Doug also added another batch of photos to SmugMug of a smaller wooden bridge. I have made a gallery for them as well and added a sample slide show below that links you to the real gallery where you can see the photos full screen. The trouble is, Doug left a name for the gallery, …

Continue reading